TM 9-2330-297-14&P
SERVICE UPON RECEIPT OF MATERIEL - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
1.
Semitrailer
DD Form 1397
Read and follow all instructions.
2.
Metal strapping,
Using strap cutters and nail pullers, re-
plywood, tapes,
move strappings, plywood, tapes, seals,
seals, and
and wrappings.
wrappings
WARNING
Drycleaning solvent PD-680 is both toxic and flammable. Avoid prolonged
breathing of vapors and avoid skin contact Do not use near open flame or
excessive heat Flash point of solvent is 138 F (59 C).
3.
Coated exterior
Using drycleaning solvent and rags, remove
parts
rust preventive compound.
4.
Semitrailer
a. Inspect the equipment for damage in-
curred during shipment.
b. If the equipment has been damaged, report the
damage on SF Form 364, Report of
Discrepancy.
c.
Check to see whether the equipment has been
modified.
5.
Equipment
a. Check the equipment against the packing
packing slip
slip to see If the shipment is complete.
b. Report all discrepancies in accordance with the
instructions in DA PAM 738-750
TASK ENDS HERE
PRELIMINARY SERVICING AND ADJUSTMENT OF EQUIPMENT
Perform the operators and organizational preventive maintenance checks and services (PMCS) as described on pages 2-
6 thru 2-13 and 4-7.
Lubricate all lubrication points as shown in the Lubrication Chart (page 4-3), regardless of interval.
Schedule the next PMCS on DD Form 314, Preventive Maintenance Schedule and Record.
Report all problems on DA Form 2407 if the deficiencies appear to involve unsatisfactory design.
Perform a break-in road test of 25 miles (40 23 kilometers) at a maximum speed of 55 mph (88.5 km/h).
Change 1 4-6