TM 9-2330-357-14&P
2-12. OPERATION OF OUTRIGGERS (Con't).
NOTE
Slave cable must be used to bring power from tractor truck or other power source to
semitrailer to operate outriggers.
(3) Connect slave cable to connector (5)
on semitrailer.
(4)
Open outrigger control panel door (8). Set power switch (6) to ON position.
CAUTION
Lower front outriggers or rear outriggers together. DO NOT operate left front
and right rear and right front and left rear at same time. Doing so could cause
semitrailer to tip over.
Front outriggers must be Implanted first, with eciual leveling between front and
rear, to prevent overload of outrigger actuator mechanism.
NOTE
Ensure that outrigger control switches are held momentarily. Circuit breaker will
open if outrigger control switches are held too long. Circuit breaker will reset in
about two minutes.
(5) Hold front outrigger control switches (9), either in pairs or individually, to lower outriggers
(3) until they contact ground. Release switches. Repeat for rear outrigger control switches.
NOTE
Ensure that outrigger control switches are held momentarily. Circuit breaker will
open If outrigger control switches are held too long. Circuit breaker will reset in
about two minutes.
(6) Simultaneously hold front outrigger control switches (9) to lower outriggers (3) until
semitrailer wheels are off the ground. Release outrigger control switches. Repeat for rear outrigger control
switches.