TM 9-2330-381-14
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services
B-Before Operation
D-During Operation
A-After Operation
W-Weekly
Equipment
Item
Interval
ITEM TO BE INSPECTED
is not ready/
no.
B
DA
W
Procedure
available if:
24
HYDRAULIC PRESSURE GAGES
a. Inspect hydraulic pressure gages (76) for leaks,
Any Class III leaks.
obvious defects, and secure mounting.
b. With clearance marker lights on, check steering low
pressure indicator light (77). If light is lit, recharge
c.
If semitrailer is coupled to tractor, ensure that
gooseneck isolation valve and suspension shut-off are
in RUN position (handle pushed inward).
2-44 Change 1