TM 9-2330-381-14
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services
B-Before Operation
D-During Operation
A-After Operation
W-Weekly
Equipment
Item
Interval
ITEM TO BE INSPECTED
is not ready/
no.
B
DA
W
Procedure
available if:
WARNING
Prior to inspection, if the platform was raised,
no one shall go under the semitrailer unless all
support legs have been lowered and are
supporting platform or serious injury to
personnel may result.
NOTE
The steering installation consists of four
steering plates and interconnecting linkages
that require multiple point inspections each
time a component/item is encountered.
Any links are broken.
a. Check four steering plates (57), all longitudinal struts
(58), all connecting links (59), and two fixed linkages
(60) for breaks and secure mounting.
b. Check steering cylinders (61) and hydraulic lines (62)
Any Class III leaks.
for leaks, defects, and secure mounting.
2-39