TM 9-2330-381-14
2-20.
OPERATING LOADING RAMPS (CONT)
(8) Open load binders (1.1), remove stow chain hooks (2) from ISO container bracket holes, and connect chain
hooks (2) at slotted holes (3) in center of platform. Close load binders (1.1) and engage snap (1) to prevent
accidental opening. If chain sags with load binder closed, then open load binder, remove quick link at end of
chain, and shorten chain until there is no sag.
(9) Remove hitch pin (4) and reinstall crowbar (5) into brackets on rear of platform. Reinstall hitch pin (4).
2-64 Change 3