TM 9-2330-381-14
2-28.
SINGLE WINCH LOADING AND UNLOADING (U.S.M.C. ONLY) (CONT)
(15) Winch operator must pay out additional winch cable. Spotter must pass winch cable (11) through streetside
gooseneck fairlead (13) and pass under pivot pin sheave (28).
(16) Winch operator must take up slack in winch cable (11). Do not put tension on winch cable.
2-184 Change 1