TM 9-2330-381-14
(47) Aline and install snatch block (2) on platform and secure in place with bolt (7), nut (6), and pin (5).
(48) Place snatch block (2) in stowage position on platform, install stow clamp (2), and secure by tightening clamp
handle (3).
(49) Return two rear payload chocks to platform and perform steps (20) thru (34) of paragraph 2-26b to restow
equipment and prepare for tractor/semitractor movement.
2-201