TM 9-2330-381-14
4.
Raise platform (para. 2-19) until all tires for affected bogie are off the ground.
5.
Remove 10 lug studs (1) and outer/inner wheel (2) from studs (3) on affected bogie. Clean lug studs and studs.
6.
If other tire maintenance is to be performed, let APU run to charge battery.
INSTALLATION
1.
Aline and install outer/inner wheel (2) onto hub studs (3) at affected bogie.
CAUTION
Wheel B has left-hand threaded lug studs. Wheel G has right-hand threaded lug
studs. Use correct rotation for each type thread or damage to lug studs and hub
studs may result.
2.
Using ratchet, 8-inch extension, and lug socket, install 10 lug studs (1) onto hub studs (3) in sequence shown.
3.
4.
Lower platform (para. 2-19) until all tires on affected bogie come in contact with the ground.
5.
Using ratchet, 8-inch extension, and lug socket, continue to tighten lug studs (1) in sequence shown. Notify unit
maintenance that lug studs (1) need to be torqued to 450 - 500 lb-ft (610 - 680 Nm). Torque in sequence shown.
6.
Raise platform (para. 2-19) until all tires for affected bogie are off the ground.
7.
FOLLOW-ON MAINTENANCE
1.
2.
Notify unit maintenance that wheel on affected bogie requires torquing.
3-47