TM 9-2330-381-14
2.
Inspect loom for breaks, cracks, and damage. If defective, replace loom portions as required. Use electrical tape
at split ends of loom as required.
3.
Inspect for missing or unreadable harness and wire markers (8 and 9). If defective, apply new markings or
replace markers. Use semitrailer electrical schematic (figure FO-1) as a guide for proper wire markings.
INSTALLATION
NOTE
Tiedown straps should be placed in a logical position to secure wiring harness.
1.
Install W2 harness (5) onto platform.
2.
Using semitrailer electrical schematic (figure FO-1) as a guide, reconnect socket connectors for W2 harness (5) to
platform lights.
3.
Using semitrailer electrical schematic (figure FO-1) as a guide, reconnect W2 harness (3) to platform junction box
terminal boards TB1 (4) and TB2 (5).
4.
Reinstall new tiedown straps as required.
5.
Secure harness in place by installing harness back into loop clamps (para. 4-31).
6.
Install two covers (2) on junction boxes (3 and 4) and secure with four captive screws (1).
4-145