TM 9-2330-383-14&P
Table 2-1. Operator Preventive Maintenance
Checks and Services (PMCS) - CONT
NOTE
Within the designated interval, these checks are to be performed in the
order listed.
B - Before
D - During
A - After
W - Weekly
ITEM TO BE INSPECTED
Procedure: Check for and have
Equipment Is Not
Item
repaired, filled, or adjusted
Ready/Available If:
Interval
No.
as needed.
B
D
A
W
9
CARGO TIEDOWN RINGS (QTY 22) AND POD
STOPS (QTY 4)
a. Inspect for damaged or missing
Cargo tiedown ring is
cargo tiedown rings (1).
missing or damaged.
b. Inspect for loose, missing, or
Pod stops are missing or
damaged pod stops (2).
loose when required for
mission.
10
NOTE
An assistant is required to check
the brake lights with trailer
connected to towing vehicle.
a. Check all lights for proper
Both taillights are
operation.
inoperative.
Both stoplights are
inoperative.
b. Check for damaged or missing
Change 1
2-15