TM 9-2330-383-14&P
2-13.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) (CONT)
Table 2-1. Operator Preventive Maintenance
Checks and Services (PMCS) - CONT
NOTE
Within the designated interval, these checks are to be performed in the
order listed.
B - Before
D - During
A - After
W - Weekly
ITEM TO BE INSPECTED
Equipment Is Not
Procedure: Check for and have
Ready/Available If:
repaired, filled, or adjusted
Item
Interval
as needed.
No.
B
D
A
W
6
TIRES
a. Check tire pressure, including
spare tire, as follows:
Pressures:
Bias ply: 100 psi (highway)
Bias ply: 65 psi (off-road)
Radial:
105 psi (highway/off-
road - all conditions)
b. Check all tires for cuts, foreign
One or more tires are
objects or unusual tread wear.
flat, missing, or
Remove any stones from between
unserviceable.
treads.
7
WHEELS
NOTE
Report any loose wheel nuts to
organizational maintenance for
torquing (450-500 lb ft).
Check wheels for damage and wheel
One or more wheels are
nuts for looseness and missing nuts.
damaged. Two or more
Check air valve for leaks.
wheel nuts are missing
on one wheel.
8
SIDE PANELS
Inspect side panels for damaged
Any side panel is
latches, panels or hinges. If
missing or has broken
damaged, notify unit maintenance.
welds. A latch or one
hinge pin is broken.
2-14
Change 1