TM 9-2330-384-14&P
4-72. PRECHECK SYSTEM MAINTENANCE (Con't).
CAUTION
Use caution not to damage pres-
sure gage (13).
(2) Hold terminal bolt (12) and re-
move elbow (16).
(3)
Remove nut (17) and starwasher
(18). Remove terminal bolt (12)
and pressure gage (13) from
cabinet (11) .
(4) Remove terminal bolt (12) from
pressure gage (13).
d. INSTALLATION OF PRESSURE GAGE
NOTE
All male threads of elbow (16) and terminal bolt (12) should be coated with
antiseize tape if not already factory-coated with an antiseize compound.
(1)
Install terminal bolt (12) to pressure gage (13).
CAUTION
Use caution not to damage pressure gage (13).
(2)
Install terminal bolt (12) and pressure gage (13) through hole in cabinet (11). Install star-
washer (18) and nut (17).
(3)
Hold terminal bolt (12) and install elbow (16).
(4)
Connect tubing (14) to elbow (16) and tighten nut (15).
4-227