TM 9-2330-386-14&P
2-17 OPERATION (CONT) .
Remove rear stake (6) and
(4)
panels (5) first. Stack first
p a n e l (5) with the flat side
against the bulkhead (9). Stack 4
second rear panel (5) with the
s t a k e side against the first panel.
Remove rear corner stakes (4) and
(5)
(6) Remove the first left and right side panels (2). stack left side panel
w i t h stake side facing out. Stack right side panel, with flat side facing
o u t , against left side panel. I n s t a l l stakes (3) on edges of left side
panel.
( 7 ) Repeat step (6), alternating panel stake out and panel stake in, until all
panels and stakes are stacked as shown.
(8) Secure panels and stakes to bulkhead (9) with two cross chains (8). Pull
chains (8) tight and secure with S-hooks (10).
2-28