TM 9-2330-386-14&P
2-17 OPERATION (CONT).
(6) At bulkhead, tilt top of
two panel splice stakes (1)
f r o m under wing panels and
remove stakes (1).
(7) Store the racks, stakes, and
c h a i n s in the approved stowage area
g. U n l o a d i n g
semitrailer
(containerized
Cargo).
WARNING
D o not place any part of your body under a container
during the loading or unloading operation as injury to
personnel may result.
(1) Pull elastic strap (1) from eye bolt (2).
(2) Turn handle (3) 90 degrees to rotate twist lock bayonet (4) to unloading
position.
2-26