Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
Semiannual PMCS Procedures for Trailer (Field Level) - Continued
Table 10. Preventive Maintenance Checks and Services (PMCS) - Semiannual (Field Level) -
Continued.
FIELD-LEVEL MAINTENANCE
EQUIPMENT
ITEM
INTERVAL
MAN-  ITEM TO BE
HOUR CHECKED OR PROCEDURE
NOT READY/
NO.
AVAILABLE IF:
SERVICED
12
Semiannual
Lifting Beams
- Continued
2. Clean with Dry Cleaning Solvent.
3. Apply a light coat of GAA to lifting
beams (28).
FRONT LIFTING BEAM
Interval: S
Temperature
Above
+40F to -
-15F to -
+40F
15F
50F
(Above  (+4C to -
(-26C to -
+4C)
26C)
46C)
GAA
GAA
GAA
NOTE
If operating conditions are severe or
abnormal, service every month.
0042 00-75


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business