Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES,
0042 00
INCLUDING LUBRICATION INSTRUCTIONS - Continued
Semiannual PMCS Procedures for Trailer (Field Level) - Continued
Table 10. Preventive Maintenance Checks and Services (PMCS) - Semiannual (Field Level) -
Continued.
FIELD-LEVEL MAINTENANCE
EQUIPMENT
ITEM
INTERVAL
MAN-  ITEM TO BE
HOUR CHECKED OR PROCEDURE
NOT READY/
NO.
AVAILABLE IF:
SERVICED
13
Semiannual
0.5
Landing Gear
Winch
WARNING
Wear heavy leather-palmed work
gloves when handling cable.
Cables can become frayed or
contain broken wires. Never let
moving cable slide through
hands, even when wearing
gloves. Failure to comply may
result in injury to personnel.
More than one-
1. Pay out landing gear winch cable
third of landing
assembly (29) completely and inspect
gear winch
for kinks, sharp bends, abrasions, and
cable assembly
broken wires. Check that no more
strands are
than approximately one-third of
broken at any
landing gear winch cable assembly
given section.
strands are broken at any given
section.
2. Check security of landing gear
Mounting
winch cable assembly mounting
hardware
hardware (30).
0042 00-76


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business