Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
CARGO BED REPLACEMENT - Continued
0103 00
OPERATIONAL CHECK
1.
Install Chock Block Stowage Box (WP 0087 00).
2.
Install Stowage Box (WP 0087 00)
3.
Install Electrical Cable Assembly (WP 0051 00)
4.
Install retractable support winch handle (WP 0013 00, Raising Foot Plate).
5.
Install ABS diagnostic brackets (WP 0074 00, Installation).
6.
Install clearance and marker lights (WP 0050 00, Clearance and Marker Light Installation).
7.
Install composite taillights (WP 0049 00, Installation).
8.
Install voltage converter box (WP 0052 00, Installation).
9.
Install splash guards (WP 0090 00, Installation).
10. Install air tank (WP 0064 00, Installation).
11. Install lifting beams (WP 0105 00, Lifting Beam Installation).
12. Install stakes and cargo bed side panels, if equipped (WP 0010 00, Install Cargo Bed Side Panel).
13. Install cargo cover, if equipped (WP 0014 00, Installation).
14. Install ladder (WP 0010 00, Stow Ladder).
END OF WORK PACKAGE
0103 00-18


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business