Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
SUBFRAME RAIL (MTVT) REPLACEMENT
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Check
INITIAL SETUP:
Maintenance Level
Materials/Parts
Field
Nut, Self-Locking (15) (Item 35, WP 0181 00)
Bolt (11), (Item 25, WP 0181 00)
Tools and Special Tools
Bolt (4), (Item 26, WP 0181 00)
Tool Kit, Genl Mech (Item 37,
Nut, Self-Locking (4) (Item 37, WP 0181 00)
Goggles, Industrial (Item 8, WP 0178 00)
Personnel
Wrench, Torque, 0-600 lb-ft (Item 52,
Three
Wrench Set, Socket (Item 46, WP 0178 00)
Equipment Conditions
Socket Set, Impact (Item 28, WP 0178 00)
Trailer uncoupled (WP 0012 00).
Wrench, Impact, Electric (Item 42,
Cargo bed removed (WP 0103 00).
Front shockmount crossmember
Wrench, Torque, 0-300 lb-in. (Item 51,
Rear shockmount crossmember
Rear crossmember removed (WP 0108 00).
Bumper removed (WP 0114 00).
REMOVAL
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to
personnel.
0110 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business