Custom Search
|
|
|
||
TM 9-2330-394-13&P
TONGUE ASSEMBLY REPLACEMENT
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Check
INITIAL SETUP:
Maintenance Level
Materials/Parts (Cont)
Field
Bolt (8) (MTVT) (Item 28, WP 0181 00)
Nut, Self-Locking (16) (LMTVT)
Tools and Special Tools
(Item 35, WP 0181 00)
Tool Kit, Genl Mech (Item 37, WP 0178 00)
Nut, Self-Locking (16) (MTVT)
Jack, Dolly Type, Hydraulic (2)
(Item 35, WP 0181 00)
(Item 14, WP 0178 00)
Trestle, Motor Vehicle Maintenance (2)
Personnel Required
(Item 38, WP 0178 00)
Two
Sling, Cargo (2) (Item 27, WP 0178 00)
Socket Set, Impact (Item 28, WP 0178 00)
References
Wrench Set, Socket (Item 46, WP 0178 00)
Wrench, Torque, 0-600 lb-ft
(Item 52, WP 0178 00)
Wrench, Impact, Electric (Item 42,
Equipment Conditions
Push-pull/air supply valve removed
Materials/Parts
EMERGENCY/SERVICE gladhand hoses
Bolt (8) (LMTVT) (Item 26, WP 0181 00)
removed (WP 0058 00).
Bolt (8) (LMTVT) (Item 28, WP 0181 00)
Landing gear removed (WP 0104 00).
Bolt (8) (MTVT) (Item 27, WP 0181 00)
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to
personnel.
0113 00-1
|
||