Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 
TM 9-2330-394-13&P
CENTER CROSSMEMBER REPLACEMENT - Continued
0119 00
OPERATIONAL CHECK, MTVT
1.
Install ABS control assembly bracket (WP 0094 00, Installation).
2.
Install ABS relay valve (WP 0067 00, Installation).
3.
Install ABS ECU valve (WP 0065 00/WP0066 00, Installation).
4.
Install axle bogie shaft (opposite side being worked) (WP 0122 00, Installation).
5.
Install frame rail (side being worked) WP 0116 00, Installation).
6.
Install cargo bed (WP 0103 00, Installation).
7.
Couple trailer (WP 0009 00, Coupling Trailer).
8.
Unchock wheels (WP 0008 00, Unchocking Wheels).
9.
Operate trailer and check for normal operation (WP 0011 00, Towing Trailer).
10. Uncouple trailer (WP 0012 00, Uncoupling Trailer).
11. Inspect center crossmember for secure installation.
0119 00-4


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business