FRAME RAIL (MTVT) REPLACEMENT
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Check
INITIAL SETUP:
Maintenance Level
Materials/Parts (Cont)
Field
Nut, Self-Locking (4) (Item 35,
Tools and Special Tools
Antiseize Compound (Item 3,
Goggles, Industrial (Item 8, WP 0178 00)
Tool Kit, Genl Mech (Item 37, WP 0178 00)
Sling, Cargo (Item 27, WP 0178 00)
Personnel Required
Socket Set, Impact (Item 28, WP 0178 00)
Two
Wrench Set, Socket (Item 46, WP 0178 00)
Wrench, Impact Electric (Item 42,
Equipment Conditions
Electrical cable assembly removed
Wrench, Torque, 0-300 lb-in. (Item 51,
Subframe removed (WP 0110 00).
Wrench, Torque, 0-600 lb-ft (Item 52,
Tongue assembly removed
Push-pull/air supply valve removed
V-rod control arms removed
Material/Parts
Bolt (4) (Item 49, WP 0181 00)
Stabilizer mounting bracket removed
Bolt (20) (Item 23, WP 0181 00)
Nut, Self-Locking (6) (Item 37, WP 0181 00)
Leaf springs removed (WP 099 00).
(LH Side)
`  Mechanical stop and resilient mount
Nut, Self-Locking (3) (Item 37, WP 0181 00)
(RH Side)
Axle bogie shaft removed
Nut, Self-Locking (20) (Item 31,
REMOVAL
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to
personnel.