TM 9-2350-222-10-2
OPERATE UNDER UNUSUAL CONDITIONS (TOW START) - Continued
7.
Remove locking pin (L) from shackle pin (M).
8.
Remove shackle pin (M) from shackle (D).
9.
sing shackle assembly, connect two tow cables
F) together.
10.
Install shackle pin (M) into shackle (D).
11.
Install locking pin (L) into shackle pin (M).
12.
Repeat steps 7 thru 11 for second tow cable
Connection.
13.
Return hammer to stowage.
TA132783
2-644