C8, TM 9-2350-230-12
TALE 2-12. MISSILE GUIDANCE AND CONTROL SYSTEM CHECKOUT PROCEDURES-Continued
STEP
PROCEDURE
FIG/ITEM
SYSTEM SELF TEST VERIFICATION (Continued)
Test checkout panel should reset; ALIGN lever should move fully
left; and the tracker motor should run for approximately 3 seconds.
If not, notify organizational maintenance.
DE-ENERGIZING THE MISSILE SUBSYSTEM
NOTE. Do not de-energize the subsystem if going directly into
a firing mission.
28
Check to insure that SAFE/READY switch is in SAFE position
29
Turn FIRE CONTROL selector to OFF position. MISSILE lamp
goes out.
30
Turn TURRET CONTROL POWER switch OFF. Lamp above switch
goes out.
31
32
Close transmitter door, and turn handle clockwise to lock door
closed.
33
Perform after-operation preventive-maintenance checks and services
2-50