TM 9-2350-275-BD
INTRODUCTION
elapsed time for all tasks required to restore the vehicle. The time available at the
selected repair site must equal or exceed the estimated time required to accomplish all
tasks associated with the BDAR.
b. Determining where BDAR will take place should be based on the guidelines in
Table 1-1. These are general
rules which must be adjusted by
the commander based on
his best estimate of how the most responsive maintenance support can be provided. He
must consider the tactical situation, maintenance backlog, personnel, tools, TMDE, and
repair parts available. The guidelines are based on a defensive scenario and can be
extended when applied to the offense.
Table 1-1. Summary of BDAR Time Guidelines
TIME GUIDELINES
ELEMENTS PERFORMING BDAR
LOCATION
1. Operator/Crew
2 Hours
Breakdown Site
2. Battalion Maintenance Team (MT)
3. Maintenance Support Team (MST) from
Forward Suppport Maintenance Company
Battalion Trains
6 Hours
1. Battalion Maintenance Platoon
2. Maintenance Support Team (MST) from
(OMCP)
Forward Support Maintenance Company
3. Maintenance Support Team (MST) from
Maintenance Battalion.
1. Forward Support Maintenance Co.
24 Hours
Brigade Support
2. Maintenance Support Team (MST) from
Area
Maintenance Battalion
3. Maintenance Support Team (MST) from
COSCOM
1. Maintenance Battalion
Division Suppport
36 Hours
2. Maintenance Support Team (MST) from
Area
COSCOM
1. COSCOM Maintenance Companies 96 Hours
Corps Support
1-12