TM 9-2590-209-14&P
CHAPTER 9
Section I. GENERAL
before installation on the vehicle. Before disassembling
9-1.
Scope.
any of the material, identify each assembled group, loose
a. This chapter contains instructions for installing
parts, or individual assembly to make certain no parts
the M9 bulldozer kit.
are missing.
b. The bulldozer kit is shipped with some parts
already assembled, and a number of those assemblies
will
require
partial
disassembly-
Section II. INSTALLATION OF CONTROL VALVE MANIOLD ASSEMBLY
c. Tack weld two pads to hull (view B).
9-2.
General. This section provides instructions for
d. Remove manifold assembly (view C).
installation of control valve manifold assembly.
e. Weld two pads into position (view D).
f. Install manifold assembly connections (view E).
9-3.
g. Attach manifold assembly to huh (view F).
a. Using a suitable lifting device, position control
valve manifold assembly on two lugs, and install two pins
(view A). Use screws to hold two pads to manifold (view
A).
b. Use floor jack and hold control valve manifold
assembly firmly against hull (view B).
Section III. ISTALLATION OF LINKAGE GUARDS
c. Install guard torsion bar housing (view A).
9-4.
General. This section provides instructions for
d. Install two guards and gasket to manifold and
the installation of the exterior linkage guards.
secure with six screws and lockwasher (view B).
9-5.
e. Insure housing assembly and two screws are
tightened (view A), and weld guards together in plum
(view C).
front torsion bar housing (view A).
b. Install housing assembly and tighten two screws
(view A).
9-1