TM 9-2590-209-14&P
Section X. ISTALLATION OF BLADE ASSEMBLY
e. Install inner tilt arm to blade assembly, and
9-27. General. This section provides instructions for
secure with pin, lock, screw, and lockwasher (view F).
the installation of blade assembly.
f. Raise blade assembly to vertical position (view
D).
a. Place blade assembly face down.
Install
g. Install outer tilt arm to blade assembly, and
pushbeams to blade assembly and position pushbeams
secure with pin, lock, screw, and lockwasher (view E).
toward tank (view A).
h. Install outer tilt arm to mounting bracket and
b. Use hydraulic system to position ram (view B).
c. Install pushbeam assembly to mounting bracket,
i. Install inner tilt arm to mounting bracket, and
and secure with pin, lock, screw, and lockwasher (view
secure with pin, lock, screw, and lockwasher (view F).
B).
d. Align cylinder ram with pushbeam, and secure
with pin, lock, screw and lock- washer (view C).
Section XI. INSTALLATION OF CARRYING HOOKS
c. Install carrying hook in other mounting bracket,
9-29. General. This section provides instructions for
and secure with shaft, setscrew, and nut (view B).
the installation of the carrying hooks.
d. Secure carrying hook in first mounting bracket
NOTE
with setscrew and nut (view C).
Install carrying hooks prior to cylinder guard installation.
e. Engage blade assembly with carrying hooks
(view D).
a. Insert shaft
through mounting bracket (view
f. Prior to welding support, manipulate handle
B).
assembly to insure freedom of movement of travel lock
b. Install arm on shaft, between mounting brackets,
hooks relative to blade assembly engagement (view E).
and secure with screw, lockwasher, and key (view A).
g. Install handle and support assembly, and secure
to arm with clevis, pin, and cotter pin. Weld support
(view E).
9-26