other on the right side.
a. Prepare six 2-pound charges of EXPLOSIVE,
b. Connect all six charges with detonating cord so
TNT, using 1-pound TNT blocks or equivalent together
they may be fired simultaneously.
with the necessary detonating cord to make up the
c. Provide for dual priming to minimize the
required charges. Place the charges as follows:
(1) Set the first and second charges on the
possibility of a misfire. For complete details on the use
outer-tilt arm assemblies, one on the left side and the
of demolition materials and methods of priming and
other on the right side.
detonating demolition charge refer to FM 5-25. Training
(2) Set the third and fourth charges on the
and careful planning are essential. The dander zone is
hydraulic cylinder assemblies, one on the left side and
approximately 250 meters.
Elapsed time: out 5
the other on the right side.
minutes.
(3) Set the fifth and
sixth charges on the
inner-tilt arm assemblies one on the left side and the
5-4