TM 9-4110-254-14
b. Installation.
(1)
Wrap anti-seize tape around compound gage (6) connector threads
(2)
Install compound gage (6), three screws (5), and new self locking nuts (4)
(3)
Install coupling (3).
(4)
Aline copper tubing (2) and connect flare nut (1) to coupling (3).
NOTE
FOLLOW-ON MAINTENANCE-
Close left side door.
Unlatch and close control box cover door.
5-65