TM 9-4110-254-14
5-32
PRESSURE GAGE (DISCHARGE PRESSURE) REPLACEMENT
This task covers:
a
Removal
b. Installation
INITIAL SETUP
Materials/Parts
Equipment Conditions:
Self Locking Nuts (3)
Control box cover door raised and latched
Anti-Seize Tape
Left side door open.
a
Removal
(1) Loosen flare nut (1) and move copper tubing (2) over to one side being careful not to bend or kink tubing.
(2) Remove coupling (3).
(3) Remove three self locking nuts (4), screws (5), and pressure gage (6). Discard self locking nuts
Figure 5-29. Pressure Gage (Discharge Pressure)
5-66