TM 9-4110-255-14
c. Installation.
(1) Install relay mounting socket (6), two screws (11), and new self locking nuts (10).
NOTE
Terminal hardware is supplied with relay mounting socket.
(2) Using tags and wiring diagram (fig. 1-4), install wire leads (7), seven lock washes (9), and screws (8).
r
Remove tags.
(3) Push defrost timer (5) into relay mounting socket (6) and install new tie down strap (4).
(5) Close control panel (3) and install two new lock washers (2) and bolts (1).
NOTE
FOLLOW-ON MAINTENANCE:
Unlatch and close control box cover door.
Connect battery (para 4-35) and put unit back into service.
4-75