TM 9-4120-378-14
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS) - Continued
Item
Item To
Not Fully Mission
Interval
Procedure
No.
Be Inspected
Capable If:
5
Weekly
Heaters
Items are loose, or
wires or elements are
damaged.
Disconnect air conditioner pow-
er supply before doing mainte-
nance work on the electrical
system.
a.
Check for breaks in wiring (1)
and insulation (2). Tighten
loose connections.
damage.
d.
Replace heating elements (3) if
damaged.
4-9