REFRIGERATION SYSTEM SERVICING- (PURGING). This task covers service.
INITIAL SETUP
Material/Part:
Equipment Conditions:
Main power source disconnected
Remarks
Action
Location/Item
I
Disconnect air conditioner power sup-
ply before doing maintenance work on
or near electrical system.
The refrigeration system must be
Item 4, during any brazing operation
performed on any component. A flow
of dry nitrogen at the rate of less than
1 - 2 cfm (0.028-0.057 m3/minute)
should be continued during all brazing
operations to minimize internal oxida-
tion and scaling.
Nitrogen cylinders are pressurized
containers. The pressure in the cylin-
der can exceed 2000 psi. A nitrogen
pressure regulator should be used at
all times when nitrogen is used for leak
check or purge operations.