ARMY TM 9-4120-380-14
NAVY EE-000-BA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-21
MEK
Methyl-ethyl ketone (solvent)
MTOE
Modified table of organization and equipment
PGV
Pressure gage valve
PMCS
Preventive maintenance checks and services
RFI
TMDE
Test, measurement and diagnostic equipment
VAC
Vacuum
VPV
Vacuum/purge valve
WC
Water column
1.6 DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE. Command decisions, according to tactical
situation, will determine when destruction of the air conditioning unit will be accomplished. A destruction plan will be
prepared by the user organization unless one has been prepared by higher authority. For general destruction procedures
for this equipment, refer to TM 750-244-3, Procedures for Destruction of Equipment to Prevent Enemy Use.
1.7 PREPARATION FOR STORAGE OR SHIPMENT. Contact unit maintenance for air conditioning unit preparation
1-2