TM 9-4120-399-14
b. Installation.
(3) Braze distributor (1) to expansion valve (2) and suction return line (3) to evaporator
(5) Leak test all new connected joints and those in the repair area (See para. 5-10).
(16) Install conditioned air discharge guard (See para. 4-22).
(17) Install intake (return air) guard (See para. 3-5).
5-62
