TM 9-4120-399-14
5-26. PRESSURE SWITCHES (S5 AND
S6).
This Task Covers:
c. Installation
b. Removal
a. Test
Initial Setup:
Tools Required
Tool kit, Refrigeration
Material's Required
None
Equipment Condition
Air conditioner shut down and cool.
a. Test.
(1) Press and release reset button to be sure that switch is not tripped.
(2) Tag and disconnect leads on pressure switch.
1 and 2 on each pressure switch. Be sure reset is pressed in.
(4) If there is no continuity, replace pressure switch.