TM 9-4120-403-14
Installation
Secure junction box cover with four captive panel fastener screws.
Follow-on procedure: Install junction box. (See para 4-32.)
4-46.
AMBIENT AIR THERMOSTAT (S2)
This task covers:
a.
Inspection
c.
Removal
b.
Test
d.
Installation
INITIAL SETUP
Tools
Tool Kit, Refrigeration
Socket Attachment
Thermometer
Materials/Parts
Thermal Mastic
Tape, Pressure-Sensitive
Equipment Conditions:
Junction Box Tilted Out and Plug P4 Disconnected (para 4-32)
Inspection
Check thermostat for cracks or evidence of other visible damage. Replace if damaged.
4-106