TM 9-4120-404-14
4-29. EVAPORATOR COIL.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tools Required
Tool Kit, Service, Refrigeration, Unit (Item 1, Appendix B)
Material/Parts Required
None
Equipment Condition
Air conditioner shut down and cool.
(1) Debraze the distributor (1) from expansion valve (2) (see para. 4-7).
(2) Debraze suction return line (3) from evaporator coil (4) (see para. 4-7).
(3) Remove six screws (5), six lock washers (6), left mist eliminator bracket (7), and right mist eliminator
bracket (8).
b. Installation.
(2) Install right mist eliminator bracket (8), left mist eliminator bracket (7), six lock washers (6) and six screws
(5).
4-73