TM 9-4120-407-14
c. Installation.
(1) Install thermostatic switch (4), two screws (2), flat washers (3), and new self locking nuts (1).
(2) Connect wire leads using wiring diagram Figure 3-5 and tags. Remove tags.
NOTE
FOLLOW-ON MAINTENANCE:
3-36. HEATER ELEMENT TESTING AND REPLACEMENT.
c. Installation
b. Removal
a. Testing
This task covers:
INITIAL SETUP
Equipment Conditions.
Tools
Service Refrigeration Unit Tool Kit
Materials /Parts
a. Testing.
(1) Tag and disconnect wire leads from the heater element (1) that is being removed.
Figure 3-55. Heating Elements (HR1 through HR6)
3-125