TM 9-4910-387-14-1
2-9. PMCS PROCEDURES (cont)
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (cont)
B BEFORE
D DURING
W WEEKLY
Procedure
Item to be
For Readiness Reporting
Check for have Repaired
Inspected
Equipment will be Reported
ITEM
INTERVAL
or Adjusted as Necessary
Not Ready/Available if:
NO.
B
D
W
2
LUBE OIL TANK
Remove RH panel assembly, check lube oil level
ASSEMBLY sight gage, and fill as required with lubricating oil
(item 11, app C).
2-10