Home
Download PDF
Order CD-ROM
Order in Print
Table 3. Position of Switches and Controls Before and After Generator Draw Test (Delco-Remy or Auto-Lite 25-ampere Generator)
Figure 32. Switches, controls, and meters used to perform generator performance and draw tests, and generator regulator serviceability test.
TM-9-4910-458-12 Test Stand Automotive Generator Alternator and Starter Floor Mounted 10 TO 50-V 500-AMP DC and 25 to 50-V 100 to 400 AMP Manual
Page Navigation
55
56
57
58
59
60
61
62
63
64
65