USE AND MAINTENANCE
INTRODUCTION
The heavy duty combination brake reliner, model 501G, is engineered to give years of precision,
1-2,
trouble-free performance as well as keeping maintenance expenses at a minimum and operating efficiency at
a maximum
The model 501G is designed to rivet and derivet brake shoes, brake bands, and clutch discs.
1-3.
Numbers in parentheses in the following paragraphs refer to the item numbers. (see figure 2-1).
TABLE OF SPECIFICATIONS
Riveting capacity range (rivet diameter) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1/8" to "
Deriveting capacity range (rivet Diameter) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1/8" to "
Drilling capacity range(diameter) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1/8" to "
Countersinking capacity range (diameter) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ''to "
Grinding capacity range (diameter) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..6'' to 24"
Grinding capacity width . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...7"
Grinder RPM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...1,725
Throat depth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...6"
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . length 16"
..
width 24"
height 53"
Motor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1/3hp, 115V, 60MZ, I phase, 175 RPM
totally enclosed fan cooled, fungus proof.
Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 160 Ibs.
INSTALLATION
1 - 7 . Remove machine and all accessories from shipping container and conduct visual inspection for in-
shipment damage.
1-8. Check all parts with packing slip to insure all items are included.
1-9. Clean all machined surfaces and tooling that are covered with a protective coating. It is recommended
that a good grease solvent be used.
1-10. Place machine in desired location and securely bolt to floor, making sure machine is level.
1-11. Insert cord and plug (61 ) with part no. 507M, plug adapter, from tool box, on end of plug, into electrical
outlet. Machine is now properly installed and ready for operation.
1