(4) AUX START Switch (S39, fig 2-2). This momentary switch is
used to test the auxiliary start circuitry of certain generator con-
trol boxes.
(5) STARTER TEST Switch (S9, fig 2-2). This switch controls
application of battery voltage to a starter undergoing test.
Timer Panel.
e.
(1) DC VARIABLE POWER SUPPLY 0-32 VDC Control (T5, fig 2-4).
This control is used to adjust the output voltage of the dc variable
.
(2) BATTERY CHARGE CIRCUIT Control (T3, fig 2-4). This control
(3) CHARGE INDICATOR Light (DS8, fig 2-4). This light, when
lighted, indicates that ac power is being applied to the battery
charging circuits-of the test stand.
(4) CHARGE TIMER (MINUTES) Control (TD1, fig 2-4). This control
is used to set the charge time (120 minutes maximum) when the test
f.
Drive Control Panel.
(1) START Pushbutton Switch (S3, fig 2-4). This switch is used
to start the varidrive and loadbank cooling air blower.
(2) AC POWER ON Indicator Light (DS2, fig 2-4). This indicator
light, when lighted, indicates that primary ac power is being applied
to the test stand power circuits.
This control is used to adjust the
(3) SPEED CONTROL (fig 2-4).
speed of the varidrive.
(4) DRIVE ON Indicator Light (DS1, fig 2-4). This indicator
light, when lighted, indicates that ac input power is being applied to
the varidrive.
(5) STOP Pushbutton Switch (S2, fig 2-4). This switch is used
to stop the varidrive and loadbank cooling air blower.
WARNING
HIGH VOLTAGES/HIGH AMPERES
High voltages and high amperes are contained
within the high voltage panel. Voltage and am-
peres may be sufficient to cause DEATH.