TM 9-4910-730-14&P
PREPARATION FOR USE, STORAGE, OR SHIPMENT
strain relief bushing for the cable entry.
b. Connect the input cable to the terminal strip
3-2. The test stand as shipped is completely assem-
provided. Connect the green ground wire to the
bled and wired. To ready the stand for operation re-
cabinet (the terminal strip mounting screws are con-
quires the installation of a power cable, not supplied
venient for this purpose).
by the manufacturer.
a. The tester should be mounted on a sturdy work
a. Examine the exterior of the crate for possible
bench, using the holes in the base.
shipping damage.
b. Allow at least 6 inches at the rear of the tester
b. Remove crate.
for ventilation.
c. Connect power cable to a source of 115 volts 60
3-4. PRELIMINARY INSPECTION
hz 1 phase.
a. Inspect the exterior of the tester for evidence
d. Check operation of the tester in both directions
of damage.
of operation. If the machine does not operate refer
b. Remove front and rear covers.
c. Inspect the interior of the tester for secure
mounting of all parts, loose or missing hardware,
evidence of corrosion, and for other damage which
could cause a malfunction.
3-7. PREPARATION FOR STORAGE
d. Check loose equipment. Accessory equipment
is stored in a compartment at the top of the machine.
exposed ferrous surfaces.
Refer to table 2-1 for a numerical listing and quan-
b. Place cover over instrument panel.
tities.
c. No other special storage procedures are re-
3-5. INSTALLATION OF
POWER INPUT
quired.
CABLE.
3-8. PREPARATION FOR SHIPMENT
a. Install the power input cable. The tester is sup-
a. No special shipping instructions are required.
plied with a power input cable and plug and with a