Table 3-19. LET Performance Test
Table 3-19. LET Performance Test-Continued
STEP
UNIT
PROCEDURE
CORRECTIVE ACTION
STEP
UNIT
PROCEDURE
CORRECTIVE ACTION
NOTE
7
MCP
Connect 1W3-P2 to J8.
The major units and panels will be identified
8
Connect 1W3-Pl to 1W12-P2.
as indicated below.
9
MCP
SELECTOR A switch to D24.
10
MCP
SELECTOR B switch to D24.
DMS-D
11
MCP
SELECTOR C switch to D24.
DMM
12
TPS
TRIG OUTPUT switch to MNL.
CT
COUNTER-TIMER
13
TPS
AMPTD(VOLTS) dial to 200.
PP
POWER panel
14
TPS
WIDTH(MS) dial to 10.0.
MCP
MONITOR/CONTROL panel
15
PPE
FUNCTION TEST switch to INT-CLK.
PPE
PROG PERFORM EVAL panel
TPS
TRIGGER PULSE SIM panel
CAUTION
LET
LAUNCH EFFECTS TRAINER
Do not short test jacks on 10215396 cable to ground,
OSC
to other voltages, or to themselves as damage will
result to the DMS-D trigger generator circuits.
1
2
LET
Remove battery compartment access cover and verify batteries are
16
PP
MAIN POWER and DMS switches to ON.
installed.
17
MCP
Connect a 10215396 cable to J15, the white probe to 1W4-J4, and
3
LET
Connect adapter 1W4 to the tracker saddle.
the black probe to 1W4-J3.
18
MCP
Disconnect the cable between J14 and the counter A INPUT.
19
CT
Connect a BNC tee to the A INPUT.
NOTE
20
MCP
Disconnect the end of the cable connected to J16, and reconnect
1W4-Pl is not connected during this procedure.
it to the BNC tee.
21
OSC
Connect a BNC tee to the CHANNEL A INPUT.
4
LET
Remove both forward and aft end caps.
22
CT
Connect a cable between the two BNC tees.
5
LET
Remove the solenoid shield. (Refer to TM 9-6920-480-34.)
OSC
6
LET
Connect 1W12-Pl to J1.
3-319