(g) Payload operator must apply payload brakes.
(h) If necessary, use crowbar to help move two rear payload chocks (9) out from under payload tracks. Move
rear payload chocks (9) back approximately 6 inches (15 cm) along both sides of platform.
(i) Operate two parallel load binders (18) to loosen both curbside and streetside parallel tiedown chains (20
and 22 or 20, 22, and 23). Disconnect parallel chains (20 and 22 or 20, 22, and 23) from parallel load
binders (18).
(j) Remove four load binders (18) and two shackles (19) from platform.
(k) Disconnect two chains (20 and 24) from streetside shackle (31) on towing lug (32) at rear of payload.
(l) Disconnect chains (25 and 23 or 25, 23, and 22) from curbside shackle (31) on towing lug (32) at rear of
payload.
(m) Lay chains and load binders toward center of platform, between and clear of the payload tracks, until
payload is unloaded.
(10) Payload operator must start and warm payload.
(11) Move streetside rear payload chock (9) along streetside platform over #4 bogie. Place curbside rear payload
chock near front streetside of platform out of the way.