TM 9-2330-381-14
2-27.
DUAL WINCH LOADING AND UNLOADING (CONT)
(24) Winch operator must push down on both DRIVERS and PASSENGER SIDE WINCH levers (35 and 23) until
front tiedown chains are tight and payload tracks (front roadwheels) are firmly on front payload chocks (42).
(25) Place both rear payload chocks (38 and 39) to rear curbside and streetside of payload.
WARNING
Prior to removing winch cable from payload, winch operator must be sure each
cable sags to top of tractor tires to relieve cable twist or injury to personnel may
result.
(26) Winch operator must pull up both DRIVERS and PASSENGER SIDE WINCH levers (35 and 23) until each
winch cable sags to top of tractor tires.
WARNING
Failure to extend safety rail while attaching or removing payload winch cable may
cause injury to personnel.
(26.1) Unlatch and extend gooseneck safety rail (43).
(27) Check for twist in both winch cables. Remove cotter pins (26) and shouldered pins (27) from clevises on both
drivers and passenger side winch cables (36 and 24) and remove cables from shackles (11) on both upper
recovery eyes (15 and 16) on payload.
2-138 Change 1