TM 9-2330-246-14
4-26. 110-VOLT SERVICE RECEPTACLE AND JUNCTION BOX REPLACEMENT
.
(M373A5).
This Task Covers:
b . Installation
Removal
a.
Initial Setup:
Materials/Parts:
Equipment Conditions:
110-volt power disconnected from semitrailer.
Four locknuts
Tools/Test Equipment:
General mechanic's tool kit
a. REMOVAL
1.
Remove two screws (9), plate (8), and receptacle (11) with wires (3 and 12) from cover (5).
Tag wires (3 and 12). Remove wirenuts (13) and disconnect wires.
2.
Remove four screws (10), locknuts (7), and receptacle (11) from plate (8). Discard locknuts.
3.
Remove two screws (6) and cover (5) from junction box (4).
4.
Remove nut (15) from connector (1).
5.
Remove two screws (14) and junction box (4).
6.
TA700177
4-46