TM 5-1940-322-10
OPERATOR INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
BEB LAUNCH USING CBT
WARNING
Prior to performing transporter operations, ensure a site
survey is conducted. Failure to meet all site requirements for a
given launch method may result in injury or death to
personnel and damage to equipment.
Ensure all engine hatches are closed and secured while boat is
under operation. Failure to comply may result in injury or
death to personnel.
When launching boat, side to side slope must not exceed 8% or
5 degrees. Failure to comply may result in injury or death to
personnel and damage to equipment.
Prior to launch, the hull drain plug must be installed. Failure
to comply may result in injury or death to personnel and
damage to equipment.
NOTE
This work package covers boat launch instructions using the
Common Bridge Transporter (CBT) and Improved Boat Cradle
(IBC). Launch instruction using M945 or M812 trucks with
boat cradle is not provided.
SITE REQUIREMENTS
In order to launch boat and construct a bridge or raft, it is necessary to locate a site
based on a list of technical site requirements. The operator/crew must understand
and observe the following site requirements when performing BEB launch.
1. Ensure launch site conditions exist for deployment of boat. Refer to
WP 0009 00. If
launch site conditions do
not meet requirements,
notify supervisor.
2. Ensure launch site requirements and authorized layout exists for deployment of
boat. Refer to WP 0009 00. If launch site does not meet requirements, notify
supervisor.
0010 00-1