TM 55-1925-283-12&P
0014 00
1
2
4
3
Figure 6. Vent Valve and Upper Ball Valve Replacement
INSTALLATION
1. Wrap the male pipe threads with antiseizing tape.
2. If the upper ball valve (figure 6, item 3) is being replaced, thread the upper ball valve into the fuel filter/water
separator body (figure 6, item 4) and tighten it snugly.
3. If the vent valve (figure 6, item 1) will be replaced, thread the vent valve into the lid (figure 6, item 2) and
tighten it snugly.
4. Prime the fuel filter/water separator (WP 0005 00) and return it to the desired readiness condition.
END OF WORK PACKAGE
00140014 /00-9 lank
00-9 10 b