Figure 2. Wet Well Sight Glass Replacement
INSTALLATION
1. Wrap the male pipe threads of the inlet valve (figure 2, item 1) and outlet valve (figure 2, item 2) with antiseizing
tape and thread them into the wet well (figure 2, item 9).
2. Install new O-rings (figure 2, item 8) into the outlet valve (figure 2, item 2) and the inlet valve (figure 2, item 1).
3. Slide the collars (figure 2, item 6) onto the new sight glass (figure 2, item 7).